Fuel Conversion/Gas Connections
22 Installation Guidelines for 60 Hz EcoGen™ Generator
LP Vapor Installation (typical)
Figure 5-7. LP Vapor Installation (typical)
B
C
A
D
E
F
G H
B
I
NG BTU = ft
3
/h X 2500
Megajoules = m
3
/h X 93.15
A. BTU and Pressure Decal
B. Check Distance with Gas Provider
C. Primary Fuel Pressure Regulator Per LP Provider
D. Manual Shutoff Valve
E. Secondary Fuel Pressure Regulator
F. Flexible Fuel Line
G. Sediment Trap
H. Accessory Valve with Manometer Port
I.
Size fuel tank large enough to provide required BTUs for generator and ALL
connected appliance loads. Be sure to correct for weather evaporation.