MAINTENANCE
Section 4 - Maintenance
Air-cooled Generators
4.12 SERVICE SCHEDULE
ATTENTION: it is recommended that all service work
be performed by the nearest Dealer.
SYSTEM/COMPONENT
X = Action
R = Replace as Necessary
* = Notify Dealer if Repair is
Needed.
FUEL
Fuel lines and connections*
Inspect
PROCEDURE
Change
Clean
FREQUENCY
W = Weekly
M = Monthly
Y = Yearly
X M
LUBRICATION
Oil level X M or 24 hours of
continuous operation.
Oil X 2Y or 200 hours
of operation.**
Oil filter X 2Y or 200 hours
of operation.**
COOLING
Enclosure louvers X X W
BATTERY
Remove corrosion, ensure X X M
dryness
Clean and tighten battery X X M
terminals
Check charge state X R EVERY 6 M
Electrolyte level X R EVERY 6 M
ENGINE AND MOUNTING
Air cleaner X R 2Y or 200 hours
Spark plug(s) X R 2Y or 200 hours
GENERAL CONDITION
Vibration, Noise, Leakage, X M
Temperature*
COMPLETE TUNE-UP* TO BE COMPLETED BY A DEALER 2Y or 200 hours
* Contact the nearest dealer for assistance if necessary.
** Change oil and filter after first eight (8) hours of operation and then every 200 hours thereafter, or 2 years, which-
ever occurs first. Change sooner when operating under a heavy load or in a dusty or dirty environment or in high
ambient temperatures.
28