EasyManua.ls Logo

GeoVision GV-AS1010 - Important Note for Maintaining Power Supply

GeoVision GV-AS1010
17 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
October 29, 2015
ii
Important Note for Maintaining Power Supply
To make sure GV-AS / EV Controllers can function properly during a power outage, be sure
to replace the internal battery on the controllers when needed. It is also recommended to
install a backup battery for compatible GV-AS Controllers.
Refer to the following sections in GV-AS Controller User Manual for instructions on how to
install a backup battery:
z GV-AS100 / 110 / 120 through GV-ASBox: See 9.1.4.F Connecting Backup Battery.
z GV-AS100 / 110 / 120 through GV-ASNet: See 9.2.4.F Connecting Backup Battery.
z GV-AS210 / 2110 / 2120: See 4.2.4 Connecting Backup Battery
z GV-AS410 / 4110 / 810 / 8110: See 5.2.4 Connecting Backup Battery
z GV-EV48: See 6.2.3 Connecting Backup Battery.
Replaceable Button Cell (GV-AS100 / 2110 / 2120 / 4110 / 8110)
For GV-AS100 / 2110 / 2120 / 4110 / 8110, you can replace the battery on your own when
you see low battery messages and icons in GV-ASManager.
Note: Make sure the plastic insulation film under the battery is removed when using GV-
AS100 / 2110 / 2120 / 4110 / 8110 for the first time. The low battery messages and icons will
appear if the plastic film is not removed.

Other manuals for GeoVision GV-AS1010

Related product manuals