ondensate level approx. 10 mm below the filter element (_marking8).
ilter/water separator empties automatically (manual emptying:
urn the drainage screw 9 in an anticlockwise direction as seen from below).
he condensate will then flow out.
arbed fitting connection for tubing PCN-4-NT already fitted.
eplace the filter cartridge if it shows signs of the following:: Low flow despite
nmodified pressure setting.
.Carry out the following steps (_Fig. 3):
– Push the unlocking slide5in the direct. of the arrow.
– Turn the filter bowl in an anti-clockwise direction (as seen from below).
– Pull the filter bowl away from the unit.
.Turn the filter plate6(in the case of MS4/6-LFM/LFX the complete filter cartridge) i
n anti-clockwise direction.
.Replace the filter cartridge if the pores are dirty (_Fig. 5). Grasp the filter cartridge
nly at the lower end when it is new. A support span is fitted in the new 5 μm filter
. Fit the individual parts again in the reverse sequence.
he following checks must then be made:
– the locking pin7of the filter bowl must face the large recess in the housing
– the unlocking slide must be heard to clip into place when the end stop is
reached (_Fig. 8).