34
07 System Operation
User Manual V1.9-2023-04-30
7.1 Check Before Power ON
No. Check Item
1
The inverter is rmly installed in a clean place where is well-ventilated and easy to
operate.
2
The PE cable, power cable, communication cable, and terminal resistor are connected
correctly and securely.
3 Cable ties are intact, routed properly and evenly.
4 Unused ports and terminals are sealed.
Check the following items before power on to avoid the battery system being damaged.
7 System Operation
6.7 Installing the Protection Cover