EasyManua.ls Logo

Goodwe Lynx Home F Plus+ Series - Moving the Equipment; Installing the Battery System

Goodwe Lynx Home F Plus+ Series
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
05 System Installation User Manual V1.9-2023-04-30
NOTICE
Ensure that the base stands on the oor vertically.
Ensure that the base clings to the wall and the arrow points outward.
Ensure that all batteries cling to the wall and the arrow points outward.
Align the holes of the upper and the lower battery modules when placing the upper battery
module.
Ensure that the locking bracket clings to the wall.
Do not install the two locking brackets on one side.
CAUTION
Operations such as transportation, turnover, installation and so on must meet the
requirements of the laws and regulations of the country or region where it is located.
Move the equipment to the site before installation. Follow the instructions below to avoid
personal injury or equipment damage.
1. Consider the weight of the equipment before moving it. Assign enough personnel to
move the equipment to avoid personal injury.
2. Wear safety gloves to avoid personal injury.
3. Keep balance to avoid falling down when moving the equipment.
5.2.1 Moving the Equipment
5.2.2 Installing the Battery System
5.2 Installing the Battery System

Related product manuals