EasyManua.ls Logo

Graco GrindLazer 480 - Engine Starting Procedures; Pre-Start Engine Checks; Engine Start Sequence

Graco GrindLazer 480
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Cutter Replacement
3A0102D 7
Cutter Replacement
Removal (Carbide Flail/Carbide Miller)
1. Remove drum (see Drum Replacement, page 6).
2. Loosen six bolts on each side of drum (do not
remove bolts).
3. Rotate plates on each side of drum so rods are
exposed.
4. Push rod out and remove cutters.
Installation (Carbide Flail/Carbide Miller)
1. Replace cutters and washers (see Cutter Stacking
Recommendations, pages 17 - 35).
NOTE: Cutters must be centered on drum for best
performance.
2. Rotate plates on each side of drum to cover rods.
3. Tighten six bolts on each side of drum to 125-175
in-lb (14-20 N•m).
4. Install drum (see Drum Replacement, page 6).
ti15065a
ti15080a
ti15075a
ti15063a
ti15079a
ti15082a

Table of Contents

Other manuals for Graco GrindLazer 480

Related product manuals