Installation
Installation Installation
Installation
Assemble Assemble
Assemble
the the
the
Proportioner Proportioner
Proportioner
Reactor2proportionersarriveinashipping
conguration.Beforemountingthesystem,
assembletheproportionerintheupright
position.
1.Removebolts(A)andnuts.
2.Swingtheelectricalenclosureupright.
3.Reinstallbolt(A)withnut.Tightenbolt(B)
andnut.
4.Positionthecablebundlesagainsttheframe.
Attachthebundlestotheframewithaloose
wiretie(C)oneachside.
$
$
%
%
F
F
W
WLL EE
&
&
&
&
0
0
0
0
Mount Mount
Mount
the the
the
System System
System
Topreventseriousinjuryduetosystem
tippingover,ensureReactorisproperly
securedtowall.
NOTE: NOTE:
NOTE:
Mountingbracketsandboltsareincluded
intheboxoflooseparts,shippedwithyour
system.
1.Usethesuppliedboltstoinstallthesupplied
L-bracketsontothesystemframeinthe
top-mostsquareholes.Installbracketson
boththeleftandrightsideofsystemframe.
2.SecuretheL-bracketstothewall.If
L-bracketsdonotlineupwiththewallstud
spacing,boltapieceofwoodtothestuds
thensecureL-bracketstowood.
26 333023U

Table of Contents

Other manuals for Graco Reactor 2 E-30

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Graco Reactor 2 E-30 and is the answer not in the manual?

Graco Reactor 2 E-30 Specifications

General IconGeneral
BrandGraco
ModelReactor 2 E-30
CategoryPaint Sprayer
LanguageEnglish

Related product manuals