EasyManua.ls Logo

Gree GMV5 - Page 283

Gree GMV5
321 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GREE Photovoltaic Direct-driven Inverter Multi VRF Units
279
Caution
Lubricant is of great importance to the normal running of compressor. You should follow the
requirements of Gree to add qualified lubricant of the specific trademark and ensure the correctness of
charging amount.
Step 15: Vacuum pumping
After lubricant is properly added, keep evacuating until the internal pressure reaches the absolute
pressure 0kgf/cm2 and the gauge pressure reaches -1kgf/cm2. This is to ensure that moisture inside the
pipeline is completely vaporized.
Vacuum pumps of the following specifications are recommended:
Type Maximum discharge rate
Purpose
For air discharge
For vacuum drying
Lubricant driven
pump
100L/min Applicable Applicable
Lubricant free
pump
50L/min Applicable Applicable
Connect a vacuum pump to big and small valves and evacuate at the same time. During evacuating,
connect a pressure gauge. When the internal pressure reaches absolute pressure 0kgf/cm
2
and
pressure gauge reads -1kgf/cm
2
, keep evacuating for 0.5~1 hour. After that, turn off the knob of high and
low pressure gauge and close the pump. 1 hour later, if pressure remains the same, charge refrigerant. If
pressure increases by 0.1 kgf/cm
2
or more, it’s necessary to conduct leak test again.

Table of Contents

Related product manuals