5.5 Fitting pipe between Outdoor Unit and the First Manifold ............................................. 43 
6 Pipe Installation and Insulation .......................................................................... 49 
6.1 Pipe Installation for the Cooling System ....................................................................... 49 
6.2 Pipe Installation for the Condensate Water System ...................................................... 58 
6.3 Insulation System .......................................................................................................... 62 
7 Electric and Controller Installation .................................................................... 63 
7.1 Precautions ................................................................................................................... 63 
7.2 Installation of the Power Cable ..................................................................................... 64 
7.3 Installation of the Communication System .................................................................... 66 
8 Vacuumization and Desiccation for the Refrigerant System ........................... 68 
8.1 Air-tightness Test ........................................................................................................... 68 
8.2 Vacuumization and Desiccation for the System ............................................................ 69 
9 Refrigerant Perfusion .......................................................................................... 70 
9.1 Calculation Method for Perfusing Refrigerant ............................................................... 70 
9.2 Method for Perfusing Refrigerant .................................................................................. 72 
Chapter 3 Commissioning Operation ................................................................... 74 
1 Security Requirements ........................................................................................ 74 
1.1 Precautions for Construction ......................................................................................... 74 
1.2 Precautions for the Use of Refrigerants ........................................................................ 74 
2 Introduction to Unit Functions ........................................................................... 74 
2.1 System Function DIP Switch Settings ........................................................................... 74 
2.2 System Function Button Operations ............................................................................. 80 
3 Commissioning Process ..................................................................................... 95 
3.1 Necessity of VRF Engineering Commissioning ............................................................ 96 
3.2 Required Files and Tools for Engineering Commissioning ........................................... 96 
3.3 Engineering Commissioning Procedures ...................................................................... 96 
3.4 References for Proper Unit Operation Parameters ..................................................... 119 
Chapter 4 Maintenance ........................................................................................ 122 
Part 1 Failure Code Table ..................................................................................... 122 
1 System Failure Code Table ............................................................................... 122 
Part 2 Exception and Troubleshooting ............................................................... 126 
2 Exception Analyzing and Troubleshooting ........................................................... 126 
2.1 Form analyzing ........................................................................................................... 126 
2.2 Gas-mixing protection of 4-way valve ......................................................................... 134 
3 Key Parts Maintenance ..................................................................................... 236 
3.1 Cautions on Controller AP1 Replacement .................................................................. 236 
3.2 Compressor Replacement and Cautions .................................................................... 241 
3.3 Cautions on Compressor Drive Replacement ............................................................. 266