Start Up Data Sheet for GREE Split Air-Conditioner
Installation Company
Address
Telephone & Fax
Technician Name
Registration No.
Client / Company
Contact Person
Installation / Appliance DATA
Model and No.
Date of Installation / Repair
Comments / Repair
Operating Data – Cooling Mode
Refrigerant Type R-290
Flammable Refrigerant
Refrigerant Name Propane
Refrigerant charge 0,200 kg
Suction Pressure P1
Suction Temperature equivalent P1
Air Temp. Entering Condenser T3
Air Temp. Leaving Condenser T4
Air Temp. Entering Evaporator T1
Air Temp. Leaving Evaporator T2
Performance Test: With appliance commissioning please operate the split– air conditioner
with HIGH indoor fan speed in mode COOLING for a minimum of 15 MINUTES. Measure air
inlet (T1) and air outlet (T2) temperature at the indoor unit. The temperature difference
should be at least 8 K.
Electrical Data
Power Supply (Voltage)
Overall Ampere Reading
Current draw Compressor
Other executions for system commissioning! Tick box for completion
Only use correct and reliable tools / equipment for system commissioning!
Functional AC system check including performance test!
Check the AC system for refrigerant leakage!
Check that electrical connections are tight!
Check that condensate drain is tight and with down-grade!
Check insulation of refrigerant transfer tubes and quick-coupler!
Check free run of condenser and evaporator fans!
Check system operation (indoor/outdoor) on abnormal operational noise!
Clean system components including air filter (if indicated)
Check display of the remote controller!
Execute briefing of the AC system user!
Company signature and date:
Client signature and date: