Setting voltage point
back to utility source
when selecting “SBU
priority” or “Solar first”
in program 01
48V model: default 46.0V, 44.0V~51.2V Settable
Setting voltage point
back to battery mode
when selecting “SBU
priority” or “Solar first”
in program 01
48V model: default 54.0V, 48.0V~58.0V Settable
Charger source priority:
To configure charger
source priority
If this off grid solar inverter is working in Line, Standby or Fault mode, charger
source can be programmed as below:
Solar energy will charge battery as
first priority.
Utility will charge battery only when
solar energy is not available.
Utility will charge battery as first
priority.
Solar energy will charge battery only
when utility power is not available.
Solar energy and utility will both
charge battery.
Solar energy will be the only charger
source no matter utility is available
or not.
If this off grid solar inverter is working in Battery mode or Power saving mode,
only solar energy can charge battery. Solar energy will charge battery if it's
available and sufficient.
Beeps while primary
source is interrupted
Overload bypass:
When enabled, the unit
will transfer to line
mode if overload occurs
in battery mode.
Bulk charging voltage
(C.V voltage). If self-
defined is selected in
program 5, this program
can be set up
48V model: default 56.4V, 48.0V~58.4V Settable