EasyManua.ls Logo

GW Instek GDS-3000 Series - Vertical Accuracy Calibration

GW Instek GDS-3000 Series
208 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MAINTENANCE
189
Note
In order to avoid noise interference, it is best if you
connect the BNC input channels (front) & the CAL
BNC (rear) with an isolated BNC-to-BNC coaxial
cable such as the RG400 BNC test lead (Part
No:4241-10200201) or a normal 5D2V BNC-to-BNC
coaxial cable when performing the Vertical
Accuracy Calibration.
8. Press Vertical again after
connecting CAL to the channel 1
input.
The calibration for Channel1 starts and ends
automatically, in less than 5 minutes. A
message is displayed when the calibration
procedure has ended.
9. Repeat the above step for Channel 2, 3* and 4*
when prompted.
*4 channel models.
10. When the calibration for all channels has
completed, the display goes back to the default
state.

Table of Contents

Related product manuals