EasyManua.ls Logo

GW Instek LCR-6002 - Warm-Up Time; Connect to the Device under Test (DUT); Figure 3-3 Connect to DUT

GW Instek LCR-6002
143 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LCR-6000 Series User Manual
23
3.4 Warmup Time
LCR-6000 Series is ready to be used as soon as the
power-up sequence has completed. However, to achieve
the specification accuracy, first warm up the instrument
for 30 minutes.
3.5 Connect to the Device Under Test
(DUT)
The LCR-6000 Series uses a four terminal measurement
configuration that provides easy, accurate and stable
measurements and avoids mutual inductance, interference
from measurement signals, noise and other factors
inherent with other types of connections.
Figure 3-3 Connect to DUT
L Force L Sense H Sense H Force
- DUT +
Do not apply DC voltage or current to the
UNKNOWN terminals. Applying a DC voltage or
current may lead to device failure. Connect the
measurement sample (DUT) to the test port
(or
the test fixture, cables, etc. after the DUT has
been completely discharged.
+
-

Table of Contents

Related product manuals