21
80-150 kW Frame & Header Kits Manual
7.2 INSTALLER CONNECTIONS FOR UPMXXL BOILER PUMP
Refer to the Wiring Connection section in the boiler Installation Instructions for wiring details.
IMPORTANT: Ensure the boiler pumps are wired to the boiler in order to ensure the boiler pump overrun facility is provided.
Tape back
1 2 3 4 5 6 13 14 15 16 17 187 8 9 10 11 12 33 3424 25 26 27 28 2919 20 21 22 23
40 41 423635 37 38 3930 31 32
Note. Used on DN80 frame and header
kits using low loss headers or plate
heat exchangers.