8
80-150 kW Frame & Header Kits Manual
IMPORTANT POINTS
Before commencing installation:
• The frames must stand on a at and level oor of suitable load
bearing capacity.
• The header must be bolted to the frame before the hoses are
connected to the boiler.
MOUNTING FRAME MUST BE SECURED
TO THE FLOOR WITH BOLTS
Allowances must be made for installation where features are in place
that may aect the nominal installation conditions.