EasyManuals Logo

Hardi MEGA 230 User Manual

Hardi MEGA 230
90 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #16 background imageLoading...
Page #16 background image
14
HARDI MEGA 230 / 350 CENTRIFUGAL OPERATORS MANUAL
4.0 ASSEMBLING THE MEGA SPRAYER
USE PROPER LIFTING EQUIPMENT
LIFTING HEAVY EQUIPMENT INCORRECTLY CAN CAUSE
PERSONAL INJURY OR MACHINE DAMAGE.
FOLLOW ALL RECOMMENDED PROCEDURES FOR REMOVAL
AND INSTALLATION OF COMPONENTS IN THE MANUAL.
4.1 Lifting Points
When loading or unloading the sprayer from a truck or trailer use the
lifting points as shown.
The Mega Sprayer is shipped in 4 parts for ease of transportation:
1. Tank & frame assembly
2. Wing assembly RH
3. Wing assembly LH
4. Boom mount kit
Fig. 3
WARNING:
NOTE CORRECT
LOCATION OF SUPPORT LEG
EXTENSIONS.
The Mega tank and frame is
delivered from the factory
with the leg extensions
facing the rear. To move
the extensions to the front of the
sprayer (fig.3), remove them
swap the right-hand side with the
left-hand side and refit.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hardi MEGA 230 and is the answer not in the manual?

Hardi MEGA 230 Specifications

General IconGeneral
BrandHardi
ModelMEGA 230
CategoryPaint Sprayer
LanguageEnglish

Related product manuals