SL600 PINNACLE STAIR LIFT: Install Manual
30SEP2020 | P/N: 76015 REV F
10
INSTALLATION
PINNACLE STAIR LIFT: SECTION 4
clearance move the rail and bracket forward.
nuts to hold the brackets in position. To
in place, secure the bottom bracket to the
a cordless drill.
See Figure 4-11.
Figure 4-11
ZERO INTRUSION
INSTALLATION
1. Measure (A) top landing to (B) bottom landing.
See Figure 4-12.
Figure 4-12
2.
the nose of the top step.
See Figure 4-12.
NOTE: The top rail is normally cut unless the length of
travel is short, less than the length of the bottom rail
when the bottom rail will need to be cut.
3.
nose, tall brackets must be used to life the top
of the rail for zero overrun. Multiple tall and/
or short brackets can be ordered.
See Figure 4-13 and 4-14.
Figure 4-13
Figure 4-14
A H
Short BracketTall Bracket
A
B