EasyManua.ls Logo

headway EDB-2 H.E - Page 67

headway EDB-2 H.E
75 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Check that Power Switch is ON, Mute is OFF,
Gain control(s) and Master are turned up and
Jacks are fully home
Ensure batteries are in good condition and
connectors are pinched firmly on(,)the correct way
around. Ensure PSU is properly plugged in at both
ends. Warning light indicates less than a 7.3v
charge per battery
Use a meter/cable tester to check jack leads and
solder connections for resistance and good
connection
Make sure jack probes are straight and that the tip
contacts are not misshapen in any way
Check that XLR leads are wired correctly as
standard. See Specifications
If a socket is set too deeply recessed into an
instrument a jack plug may not make full contact
Check that mains supply is operating in chain of
power supply with earth connected at all points
It is recommended the best quality of connectors
be used. We recommend quality products: Neutrik,
Deltron & Schurter, Switchcraft, ST Professional &
GH. Headway offers quality jack leads with
appropriate lengths and specifications
If EDB-2 H.E has become overheated, turn off,
cool it down and try turning on a little later to re-
start, checking leads and connected devices. Try
changing or removing batteries
P.67

Table of Contents