EasyManuals Logo
Home>HIKVISION>Security Camera>E Series

HIKVISION E Series Installation Manual

HIKVISION E Series
42 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #31 background imageLoading...
Page #31 background image
E Series IR Speed Dome Installation Manual
© Hikvision Digital Technology Co., Ltd. All Rights Reserved.
30
Grounding for Cement Pole/Wall Installation:
When the speed dome is installed in environment where is relatively insulating to the earth, e.g.,
cement pole or cement wall, then only the control center requires proper grounded locally. Refer to
the following figure.
PowerPower
Power supply board
Power supply board
Video cable
Control line
Cement pole/wall
Display
Operating center
Keyboard
DVR
UPS
GND
GND
GND
GND
1.5m underground
Figure A-2 Grounding in Cement Pole/Wall Installation

Other manuals for HIKVISION E Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the HIKVISION E Series and is the answer not in the manual?

HIKVISION E Series Specifications

General IconGeneral
BrandHIKVISION
ModelE Series
CategorySecurity Camera
LanguageEnglish

Related product manuals