EasyManua.ls Logo

Hitachi RAS-8.0HNBRMQ1 - Page 24

Hitachi RAS-8.0HNBRMQ1
187 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17
INSTALLATION
Model: RAS-7.0~12HNBRMQ1
Unit: mm
(3) The drain holes are working during the heating and defrosting operation. Choose a place where well
drainage is available or provide a groove for draining.
(4) The unit will condensate in heating mode, and the condensate will freeze in colder climates, which may
cause the road slippery, if not properly managed.
(5) The base of the outdoor unit should be installed on a foundation, which is made up of concrete or metal
frame. When the rubber gaskets have been adopted, they should also be positioned under the feet of the
outdoor unit.
(6) When the outdoor unit is installed on a metal frame, the metal plates should be used to adjust the frame
width for stable installation.
Metal
Plate
Outdoor
unit
is
stable.
of
Outdoor
Unit
Foot
Frame
Outdoor
unit
is
unstable.
Foot
of
Outdoor
Unit
Frame
Recommended Metal PlateSize (Field-Supplied):
Material: Hot-Rolled Mild Steel Plate (SPHC);
Plate Thickness: 4.5mm.
Aluminum ns have very sharp edges, handle them carefully to avoid injuries.
Note:
Install the outdoor unit on a roof or in an area where only service engineers come in contact with the outdoor unit.
'UDLQ+ROHº
'UDLQ+ROHº
'UDLQ+ROHº

 

  
 










Table of Contents

Other manuals for Hitachi RAS-8.0HNBRMQ1

Related product manuals