EasyManua.ls Logo

Hitachi YUTAKI M R32 Series - Drain Pipes Connection; Space Heating Pipes Connection

Hitachi YUTAKI M R32 Series
122 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
114
PMML0600 rev.0 - 06/2022
8
YUTAKI H
MAINTENANCE
! CAUTION
Take care with the electrical box components in order to avoid damaging it.
8.2.3 Space heating pipes connection
The unit is factory supplied with two shut-o valves which have to be connected to the water
inlet / outlet connections. With these shut-o valves it is very practical to connect the indoor
unit to the heating system by using the factory supplied gaskets just below the valves (G 1-1/4”
connection). Then, the space heating installation can be carried out.
Gaskets
Shut-o valves
8.2.3.1 Drain pipes connection
For a correct drainage, connect the drain pipe for the safety valve to the general draining system.
NOTE
The safety valve is activated when water pressure reaches 3 bars.
Drain taps must be provided at all low points of the installation to permit complete drainage of
the circuit during servicing.

Table of Contents

Related product manuals