119
PMML0600 rev.0 - 06/2022
8
YUTAKI H COMBI
MAINTENANCE
◆ Open the electrical box cover
1 Remove the indoor unit front cover.
2 Unscrew the 2 front screws of the electrical box cover and then, open it.
! CAUTION
Take care with the electrical box components in order to avoid damaging it.
8.3.3 Space heating pipes connection
The unit is factory supplied with two shut-down valves to be connected to the water inlet/outlet
pipe. With these shut-down valves it is very practical to connect the indoor unit to the heating
system by using the factory supplied gaskets just below the valves (2-3HP: G 1”; 4-6HP: G 1-1/4”).
Then, the space heating installation can be carried out.
Shut-o valves
Gaskets