EasyManua.ls Logo

HMS Networks Intesis AC Cloud Control - Page 14

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Device Configuration 1.0
© HMS Industrial Networks S.L.U - All rights reserved
This information is subject to change without notice
URL https://www.intesis.com
14 / 24
If the configuration network has been carried out successfully the light of the LED will follow
a light sequence (See Figure 3.5). Tap on Done.
Figure 3.5 LED configuration network sequence.