EasyManua.ls Logo

Hobie Wave - Page 20

Hobie Wave
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20
hobie.com
There is a two-fingered hook at the
top of the mast. The halyard has a
small bead of metal which is held
by this hook when fully raised.
When fully raised, pull the halyard
line (while still holding tension)
forward and away from the mast.
Keep the line centered with the
mast. Then pull the line back
against the mast. This will place
the bead below the two fingered
hook. Release the halyard to en-
gage the hook. Repeat the process
if the sail does not remain at the
top of the mast. The line must be
centered with the mast to engage
the hook. Tie the halyard line to the
mast cleat.
3
4
Assembly Required

Other manuals for Hobie Wave

Related product manuals