Transport,installationandstart‐up
 
UsermanualforHONR100gaspressureregulatorwithHONP095NGpilot  33
 
Makesurethatthefollowingrequirementsaremetbeforetransportation:
  Youhaveseenandtakenintoaccountallinstructionsonthepackagingregardingthe
orientationofthepackeddevice,thecenterofgravity,andattachmentpoints.
  Thetransportrouteisclearofobstaclesandotherbarriers,andthereisenoughspace
availableforthedimensionsofthepackeddeviceandthehandlingequipment.Make
suretomeasureallofthepackage’sdimensions!
  Thetransportroutewillbeabletohandletheloadexertedbythetotalweightofthe
handlingequipmentandtheloadbeingtransported.
  Thereisenoughspaceforunpackingandinstallingthedeviceattheinstallationloca‐
tion.
Proceedasfollows:
Figure Step Description
1
Leavethetransportpanels(1)onthegas
pressureregulatorduringtransport.
2 Rigtheslingtotheeyebolt(1).
3 Liftthegaspressureregulator.
Slowlyandcarefullytransportthegas
pressureregulatortothelocationwhereit
willbeinstalled.
 
Preparingfortransporta‐
tion
Transportingthedevice