EasyManua.ls Logo

Honeywell Notifier ACPS-610/E - 3.2.4 Working Online; 3.2.5 Downloading to the ACPS-610

Honeywell Notifier ACPS-610/E
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
30 ACPS-610/E Manual — P/N 53018:A1 07/31/2007
Configuration and Programming Programming the ACPS-610
3.2.4 Working Online
In addition to creating and opening databases on your local drive, you may modify any ACPS-610
that is directly connected to your PC with the PK-PPS programming utility. When you are in the
program and you are connected via the USB to a power supply, that power supply is represented by
the icon in the left window. Click on this icon to see the power supply’s current configuration and
version information (Figure 3.3).
When you right-click on the ACPS-610 icon, you have three work options:
SAVE Select this option to save the power supplys current configuration as a database file
(*.pdb) on your local drive.
MODIFY Select this option to edit the power supply’s current configuration. After you make all
of your changes, your new database will overwrite the one in the ACPS-610. You will also
have the option to save this database to your local drive.
DOWNLOAD Select this option to download a database, application, or bootloader file to the
power supply. See Section 3.2.5.
Figure 3.3 PK-PPS: Current Database
3.2.5 Downloading to the ACPS-610
1. Check to make sure that the PC is connected to the ACPS-610 (Section 3.2.2).
2. Right click on the ACPS-610 icon, select
DOWNLOAD and choose the type of application
you wish to download or select Download from the Operation menu.
You may download a program database file (*.pdb), an application file (*.hex), or a
bootloader file (*.hex).
3. Use the Browse button to navigate to the file you wish to download.
4. Open the file to download it to the ACPS-610.
5. Disconnect USB cable AFTER programming is complete.
3.2.6 ACPS-610 Configuration
PK-PPS sets parameters for the ACPS-610 and all of its outputs. Selections must be made in order shown
below. Lower level options will not be available until upper level options have been selected.
The worksheet’s summary section displays all selections. When programming is complete, PK-PPS
displays the SLC address consumption that is result of your selections.
NOTE: Start the PK-PPS utility before connecting to the power supply.
PK-PPS_CurrentDBa.jpg
Power
Supply
Icon
Database
and
Firmware
Version
Information

Table of Contents

Related product manuals