EasyManua.ls Logo

Howe 2000-RLE - Piping Table; Refrigerant Pipework; Refrigerant Pipework Insulation Requirements

Default Icon
53 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EngineeringGuidelines
7
PipingTable
Model LiquidLine* SuctionLine* SuctionRiser*
1000RLE 3/8”ODS 7/8”ODS 3/4”ODS
2000RLE 1/2"ODS 11/8”ODS 7/8”ODS
3000RLE 1/2"ODS 13/8”ODS 11/8”ODS
*Forrunsupto150feet.Iflonger,usenextlargerlinesize.
RefrigerantPipework
Howerecommendsthefieldrefrigerantpiping
beinstalledaccordingtotheSuggested
RefrigerantPipingDiagramshownonprevious
page.ThesepipesizesareforHFCrefrigerants
andarenotapplicabletoR744installationsor
secondaryrefrigerantapplications.
Howerecommendstheuseofharddra w nACR
typeLtubingwithrefrigeration
gradewrought
copperlongradiuselbowsandfittingsonly.No
softdrawntubingshouldbeusedinthe
refrigerantpipeinstallation.
NofieldinstalledPtypeoiltrapisrequiredat
thebaseofthesuctionrisersinceallIceFlakers
areinternallypipedwithasuctiontrapatthe
outletoftheevaporatorwithintheenclosure.
EvaporatorPressureRegulator(EPR)valves
mustbefieldinstalledwiththearrowcorrectly
pointinginthedirectionofflow.
Installationspecificationsshouldrequireall
refrigerantpipingshouldbejoinedwitha
suitablesilverbrazingalloywhilepurging
nitrogenthroughthepipingtopreventcopper
oxidationscalefromforminginsidethetubing.
ForclosecouplingIceFlakertoCondensing
Unit,useaminimumoftenfeettotalstraight
lengthofpipe.Minimizebendsandfittings.
SuctionLinetoincludeEPRandHeatExchanger.
RefrigerantPipeworkInsulation
Requirements
Fieldrefrigerantpipeworkshouldbeinsulated
withclosedcellflexibleelastomericfoam
thermalinsulationintendedforcold
applications.
Liquidlinesshouldbecoveredwith1/2”thick
andsuctionlineswith3/4”thickmaterial.
Theinsulationmaterialshouldbemoisture
vaporresistantwhencorrectlyinstalled
accordingtothemanufacturer’sinstructions.
Thefield
installedEvaporatorPressure
Regulator(EPR)valveandSuctionLineHeat
Exchangermustlikewisebeinsulated.Ifthese
systemcomponentsareleftuninsulatedthey
become“thermalbridges”andunwanted
condensationandicewillformanddrip.
Allbuttjointsandseamsmustbeproperlyfield
fabricatedaccordingtotheinsulation
manufacturer’sfusingadhesiveinstructions.
Selfadheringclosedcellfoaminsulationisalso
availableinrollsandcanbeusedtosupplement
theconventionaltubularmaterialsonirregular
shapes,EPRvalves,andcaps.


Related product manuals