EasyManua.ls Logo

HP 3465B - Page 54

HP 3465B
58 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Model
3465B
Section
VII
7-37.
Display
and
Display
Driver
Verification
and
Trouble
shooting
Test.
7-38.
This
test
should
be
performed
in
addition
to
the
quick
test
to
check
the
display
and
display
driver.
The
test
is
also
used
for
troubleshooting
between
the
display
driver
and
display
LED
inputs.
Implement
the
test
as
follows:
a.
Connect
the
test
point
7
and
test
point
LT
located
on
the
A2
display
interface
board.
b.
Verify
display.
If
all
drivers
and
LED's
are
function
ing
properly,
the
display
will
appear
as
follows:
b.
Verify
the
following
signals:
i
u
u
u
I
I
NOTE
Position
of
the
decimal
point
will
be
dependent
on
the
range
selected.
If
the
display
is
not
realized,
the
failure
can
be
determined
by
symptoms
and
the
use
of
Schematic
3.
If
the
fault
is
corrected,
return
the
ANALOG/DIGITAL
ISOLATION
JUMPER
to
its
original
position
(connect
test
point
COM?
to
CP).
7-39.
Place
the
ANALOG/DIGITAL
ISOLATION
JUMPER
from
test
point
CP
to
test
point
PL.
Place
the
front
panel
controls
in
the
following
positions:
POWER
ON
FUNCTION
DC
Volts
RANGE
200
m
The
first
indication
that
the
digital
and
display
section
is
functioning
properly
will
be
a
front
panel
display
of
I
I I
POLARITY
ALTERNATING
with
the
plus/minus
indicator
alternating
at
a
1.25
Hz
rate.
In
the
event
that
this
verification
or
any
of
the
following
verifications
fail,
normal
digital
troubleshooting
techniques
in
conjunction
with
Schematic
3
should
be
used
to
isolate
and
correct
the
failure.
7-40.
Polarity,
Zero
Detect
and
Clock
Circuit
Verification.
7-41.
Maintain
the
ANALOG/DIGITAL
ISOLATION
JUMPER
connection
between
test
points
CP
and
PL
with
FUNCTION
and
RANGE
settings
at
DCV
and
200
m
respectively.
a.
Verify
the
100
kHz
clock
at
test
point
CL.
TEST
POINTS
PL
400
ms
TC
RS
200
ms
0
•APPROXIMATELY
100
fis
PULSE
If
the
PL,
TC
and
RS
signals
are
present,
the
polarity,
zero
detect
and
clock
circuits
are
verified.
7-42.
Analog
Switch
Lines
and
Control
State
Counter
Verification.
7-43.
Maintain
the
ANALOG/DIGITAL
ISOLATION
JUMPER
connection
between
test
points
CP
and
PL
with
FUNCTION
and
RANGE
settings
at
DCV
and
200
m
respectively.
Verify
the
following
signals:
SIGNAL
10
(U9
PIN
3)
11
(US
PIN
10)
12
(US
PIN
9)
n
I
SOO
ms
IZ
(U6
PIN
n,TJ
U
LT
0
-7
0
-7
0
-7
0
-7
•1
TO
6
MS
PULSE
If
verification
of
the
10,
II,
12
and
IZ
signals
is
made,
the
analog
switch
lines
and
control
state
counter
are
function
ing.
7-44.
Data
Accumulator
Input/Output
Verification.
7-45.
Maintain
the
ANALOG/DIGITAL
ISOLATION
JUMPER
connection
between
test
points
CP
and
PL
with
FUNCTION
and
RANGE
settings
at
DCV
and
200
m
respectively.
Perform
the
following
steps.
7-5

Table of Contents

Related product manuals