59
Index
Numerics
10/100/1000 Base -T Ethernet
port, 45
por
t LED, 50
1
00/1000Base-X SFP
port, 45
por
t LED, 52
19
-inch rack
switch installation, 8
–4
8 VDC power source
connecting, 20
A
AC
power source
connecting, 19
A
C power supply
grounding switch through AC power supply PE
wire, 15
ac
cess
first time switch access, 22
acce
ssories needed for installation, 6
A
ppendix
A, chassis views and technical
specifications, 37, 40
B
, FRUs, 44
at
taching
mounting bracket to switch chassis, 9
B
b
its per second (parameter), 23
bu
ilt-in AC power supply
securing AC power cord, 19
bu
ilt-in power supply
failure (troubleshooting), 34
sec
uring AC power cord, 19
C
ca
ble
connecting console, 22
connec
ting power, 18
f
iber cable laser safety recommendations, 6
gr
ounding the switch with grounding conductor
buried in the earth ground, 15
gr
ounding the switch with grounding strip, 13
planning
IRF cabling scheme, 30
c
hassis
attaching mounting bracket to switch chassis, 9
vi
ews, 37
cl
eanness
installation site, 5
co
mbo
interface, 48
co
nfiguring
IRF basic settings, 32
swi
tch, 22
tr
oubleshooting configuration terminal
problems, 36
ve
rify the IRF fabric setup, 32
connec
ting
–48 VDC power source, 20
A
C power source, 19
co
nsole cable, 22
f
irst time switch access, 22
I
RF member switches in a ToR solution, 31
I
RF member switches in one rack, 30
I
RF physical ports, 32
planning I
RF connections, 29
po
wer, 18
RP
S, 20
co
nsole
connecting cable, 22
por
t technical specifications, 45
D
data b
its (parameter), 23
de
vice
troubleshooting built-in power supply failure, 34
tr
oubleshooting hot-swappable power supply
failure, 35
tr
oubleshooting power supply failure, 34
displa
ying
troubleshooting garbled terminal display, 36