Model
5315A
/ B
Installation
2-1
.
INTRODUCTION
SECTION
II
INSTALLATION
2-
2.
This section
co
ntains information for unpacking, inspection, storage, and
in
stallation.
2-3. UNPACKING
AND
INSPECTION
2-4.
If
the
shipping carton
is
damaged, inspect the instrument for visible damage (scratches,
dents, etc.).
If
the
in
strument
is
damag
ed,
noti
fy
the
carrier and the nearest Hewl
ett
-Packard
Sales and Servi
ce
Office
im
mediately (offices are
li
sted at t
he
back of this manual.) Keep
the
s
hi
pping carton and packing material for the carrier's inspection.
Th
e Hewlett-Packard
Sa
les and
Se
rvice Office
wi
ll
arrange for repair or replac
emen
t of your instrument without
wa
it
in
g
fo
r the
cla
im
against the carrier to
be
settled.
2-5. PREPARATION FOR
USE
2-6. Power Requirements
2-
7.
The
HP
53
1
5A
/ B requires a power sour
ce
of 100-, 115-.
210
-, or
230
-volt ac, +5%. -10%,48 to
66
Hz
s
in
gle phase. Power consumption is
app
roxi
ma
tely 12
wa
tts. The
5315A
(o
nl
y) may also
be
power
ed
by
the
Op
ti
on
002
Battery Pack. See Secti
on
I, Specifications and Secti
on
VIII,
pa
ra
graph
8-60,
fo
r description.
2-8. Line
Volt
..
ge
Selection
CAUTION
Before
connecting
the
instrument
to
ac
power
lines.
be
sure
that
the
wolt
..
ge
selector
is
properly positioned as described below.
2-9.
Th
e
5315A
is
preset at the factory to
one
of fou r line voltage selection
s.
Refer to
the
rear
panel label (see
Figure
2-1
)
to
determ
ine which of
the
fo
llo
wing sett
in
gs
is preselected:
Option
100:
Option
115
:
Option
210:
Option
230:
86- to l
06-
volt ac
li
ne
104- to
127
-volt ac line
190- to 233-volt ac line
206-
to
2S0
-volt
as
line
YOI.TAC! SEIlIIol,.
OI'TlON'
Figure 2-1. 5315A Line Vo/lage 5eleclion
_
..
',,.,
_
..
-.
2-1