4-1.
INTRODUCTION
SECTION
IV
PERFORMANCE
TESTS
4-2. The procedures
in
this section test
the
electrical
performance
of
the
5315A/B
us
in
g
the
specifications in Table 1-1
as
performance
standards. The
complete
performance
tests are given
in
Table 4-2. All tests can be
performed
without
access
to
the
inside
of
th
e
instrument.
4-3. OPERATIONAL VERIFICATION
4-4. The abbreviated checks given
in
Table
4-1
can be
performed
to
give a high degree
of
confidence
that
the
5315A/ B
is
operating
properly
wit
h
out
performing
the
complete
perform-
ance test. The operational verificati
on
should be useful
for
incoming
QA,
routine
maintenance,
and after instrument repair.
4-5. EQUIPMENT REQUIRED
4-6. Equipment
required
for
the
comp
lete test and
operation
verifica
ti
on
is
listed
in
Table 1-4.
Any
equipment
which
satisfies the critical specifications given
in
the table may be substituted
for
the
recommended
model
numbers.
4-7.
TEST
RECORD
4-8. Results
of
the
performance
tests
may
be tabulated
on
the
Performance Test Record.