12. Connect each power cord to the power source.
13. Power up the server .
ResultsResults
The installation is complete.
Installing primary and secondary risersInstalling primary and secondary risers
PrerequisitesPrerequisites
Before you perform this procedure, make sure that you have the following items available:
The components included with the hardware option kit
T-10 Torx screwdriver
ProcedureProcedure
1. Power down the server.
2. Do one of the following:
Disconnect each power cord from the power source.
Disconnect each power cord from the server.
3. Do one of the following:
Extend the server from the rack .
Remove the server from the rack .
4. Remove the access panel .
5. Remove the riser cage.
6. Remove the riser board.
7. Install the riser.