EasyManua.ls Logo

HPE ProLiant MicroServer Gen11 - Server Warnings and Cautions; Preparation Procedures

HPE ProLiant MicroServer Gen11
123 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
This symbol indicates the presence of coin cell battery.
WARNING:WARNING:
INGESTION HAZARD: This product contains a button cell or coin battery.
DEATH or serious injury can occur if ingested.
A swallowed button cell or coin battery can cause Internal Chemical Burns in as little as 2 hours.
KEEP new and used batteries OUT OF REACH of CHILDREN.
Seek immediate medical attention if a battery is suspected to be swallowed or inserted inside any part of the
body.
Server warnings and cautionsServer warnings and cautions
WARNING:WARNING:
To reduce the risk of personal injury, electric shock, or damage to the equipment, disconnect the power cord to remove
power from the server. Pressing the Power On/Standby button does not shut off system power completely. Portions of the
power supply and some internal circuitry remain active until AC power is removed.
WARNING:WARNING: To reduce the risk of personal injury from hot surfaces, allow the drives and the internal system components to
cool before touching them.
CAUTION:CAUTION:
Protect the server from power fluctuations and temporary interruptions with a regulating UPS. This device protects the
hardware from damage caused by power surges and voltage spikes and keeps the server in operation during a power
failure.
CAUTION:CAUTION:
To prevent improper airflow and insufficient cooling that can lead to thermal damage, do not operate the server with the
front bezel or chassis cover removed.
CAUTION:CAUTION: To prevent damage to electrical components, properly ground the server before beginning any installation
procedure. Improper grounding can cause electrostatic discharge.
CAUTION:CAUTION:
To avoid data loss, Hewlett Packard Enterprise recommends that you back up all server data before installing or removing
a hardware option, or performing a server maintenance or troubleshooting procedure.
Preparation proceduresPreparation procedures
PrerequisitesPrerequisites
Before powering down the server for an upgrade, maintenance, or service procedure, do the following:
Perform a backup of critical server data .
HPE ProLiant MicroServer Gen11 Maintenance and Service Guide 24

Related product manuals