EasyManua.ls Logo

Huawei AR530 Series - Page 149

Huawei AR530 Series
408 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 4-7 Networking diagram for configuring basic QinQ
PE1
P
PE2
CE2
V
L
A
N
2
0
CE1
V
L
A
N
2
0
V
L
A
N
2
0
V
L
A
N
2
0
Network
VLAN 10 to 50
Enterprise A
Branch 1
VLAN 10 to 50
Enterprise A
Branch 2
GE0/0/0
GE0/0/1
GE0/0/0
GE0/0/1
GE0/0/0
GE0/0/0
GE0/0/1
GE0/0/0
Configuration Roadmap
The configuration roadmap is as follows:
You can configure the basic QinQ function on a CE connected to a PE and implement
communication between two branches of enterprise A through VLAN 20 provided by the carrier.
1. Create a bridge group and add a sub-interface to the bridge group.
2. Configure VLANs allowed by the sub-interface.
3. Configure basic QinQ on the CE interface connected to the PE so that the CE can add the
S-VLAN tag to user packets.
4. Add interfaces of the PE and P to VLAN 20 so that packets from VLAN 20 are allowed to
pass through.
Procedure
Step 1 Create a bridge group and add a sub-interface to the bridge group.
# Create a bridge group and add a sub-interface to the bridge group on CE1. The configuration
of CE2 is similar to that of CE1.
<Huawei> system-view
[Huawei] sysname CE1
[CE1] bridge 1
[CE1-bridge1] quit
[CE1] interface gigabitethernet 0/0/0.1
[CE1-GigabitEthernet0/0/0.1] bridge 1
[CE1-GigabitEthernet0/0/0.1] bridge vlan-transmit enable
Step 2 Configure VLANs allowed by the sub-interface.
# Configure VLANs allowed by the sub-interface on CE1. The configuration of CE2 is similar
to that of CE1.
Huawei AR530&AR550 Series Industrial Switch Routers
Configuration Guide - Ethernet Switching
4 QinQ Configuration
Issue 01 (2014-11-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
135

Table of Contents

Other manuals for Huawei AR530 Series

Related product manuals