7.2.1 Energy Control
On the home screen, tap Power adjustment to perform the corresponding
operation.
Figure 7-10 Energy control
7.2.1.1 Grid-tied Point Control
Function
Limits or reduces the output power of the PV power system to ensure that the
output power is within the power deviation limit.
Procedure
Step 1 On the home screen, choose Power adjustment > Grid-tied point control.
Figure 7-11 Grid-tied point control
Copy-SUN2000-(2KTL-6KTL)-L1
User Manual 7 Man-Machine Interaction
Issue 06 (2022-03-10) Copyright © Huawei Technologies Co., Ltd. 67