You are advised to install the device within 24 hours of removing the outer packing.
Unpacking the Device
Step 1 Use diagonal pliers to cut the packing tape, and use a utility knife to slice the tape
along the gaps in the packaging. Take care not to damage the device inside.
Step 2 Open the packaging and check the deliverables.
----End
Checking Deliverables
After unpacking the device, check that the deliverables are intact and complete,
and check that the device is free from any obvious damage. If any items are
missing or damaged, contact your dealer.
For details about the number of accessories delivered with the device, see the
Packing List
included in the packaging.
4.4 Moving the Smart PCS
If the installation position is too high to install the Smart PCS directly on the
mounting bracket, run a rope (strong enough to bear the weight of the Smart
PCS) through the two lifting eyes, and use it to hoist the Smart PCS.
Ensure that the lifting handles are installed to the correct screw holes. Do not
install them to the mounting bracket screw holes on the top. Incorrect installation
may cause device damage or personal injury.
● Four persons or appropriate transportation tools are required to move the
device.
● Place a foam pad or cardboard under the device to protect its enclosure from
damage.
● Use lifting handles to facilitate installation, which are optional and delivered
separately. Ensure that the lifting handles are securely installed. After the
installation is complete, remove the lifting handles and keep them properly.
● To prevent damage to the device surfaces, do not use metal lifting ropes such
as steel ropes.
● Slowly and steadily hoist and position the Smart PCS to avoid bumping and
damaging the device enclosure.
LUNA2000-100KTL-M1 Smart Power Control System
User Manual 4 Installation
Issue 02 (2023-01-10) Copyright © Huawei Technologies Co., Ltd. 28