EasyManua.ls Logo

Huawei LUNA2000-100KTL-M1 - Powering off the Smart PCS

Huawei LUNA2000-100KTL-M1
115 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NO TICE
After cleaning is complete, reinstall the air inlet bae. Tighten the screws to a
torque of 1.2 N·m.
Removing the Air Outlet Protective Cover
Figure 7-2 Removing the protective cover
NO TICE
After cleaning is complete, reinstall the air outlet protective cover. Tighten the
screws to a torque of 1.2 N·m.
7.2 Powering O the Smart PCS
Context
Perform the following procedures when powering o the Smart PCS for
maintenance or replacement to prevent personal injury and equipment damage.
CA UTION
If the DC switch between the Smart PCS and the DC LV Panel busbar is
automatically turned
o, do not turn on the switch before the fault is rectied.
If the AC switch between the Smart PCS and the grid is automatically turned
o, do not turn on the switch before the fault is rectied.
Before power-o for maintenance, do not touch the energized components of
the Smart PCS, as this may result in electric shocks or arcs.
Procedure
Step 1 Wear proper personal protective equipment (PPE).
LUNA2000-100KTL-M1 Smart Power Control System
User Manual 7 Device Maintenance
Issue 02 (2023-01-10) Copyright © Huawei Technologies Co., Ltd. 74

Table of Contents

Related product manuals