EasyManua.ls Logo

Huawei LUNA2000-100KTL-M1 - Page 88

Huawei LUNA2000-100KTL-M1
115 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 7-20 Energy yield calibration
Step 6 (Optional) If a third-party NMS that complies with the IEC 104 protocol is
connected, choose Settings > IEC104, and ensure that the teleindication,
telemetering, telecontrol, and teleadjust signal numbers of the new Smart PCS on
all tab pages under IEC104 are the same as those of the faulty Smart PCS.
Step 7 Click Deployment Wizard and then click Search for Device to check cable
connections and allocate addresses.
Figure 7-21 Searching for devices
LUNA2000-100KTL-M1 Smart Power Control System
User Manual 7 Device Maintenance
Issue 02 (2023-01-10) Copyright © Huawei Technologies Co., Ltd. 82

Table of Contents

Related product manuals