PDU8000 Modular Precision PDC V2.0 
User Manual 
 
Huawei Proprietary and Confidential                                     
Copyright © Huawei Technologies Co., Ltd. 
 
Voltage sampling fuse of phase L1 on the power board to the right of the 
third output subrack (cabinet rear view)/Voltage sampling fuse of phase 
L3 on the power board to the left of the third output subrack (cabinet rear 
view) 
 
 
 
The preceding tables use a fully configured PDC as an example. The actual cabinet configurations 
prevail. 
 
*FU*-1 indicates the fuse input end, and *FU*-2 indicates the fuse output end. 
Procedure 
Step 1  Push the fuse handle up outwards. 
Step 2  Remove the faulty fuse. 
Figure 8-17 Removing a fuse 
 
 
Step 3  Install a new fuse, and reinstall the handle. 
----End 
8.4.6 Replacing a monitoring board 
Prerequisites 
 
Tool: Phillips screwdriver 
 
Materials: new monitoring board