Cables are neatly arranged, and cable insulation layers are intact.
Different types of cables are bound separately.
Connection ports and cabling methods facilitate maintenance, cable
routing, and capacity expansion.
Cable connectors prepared onsite must be normal, secure, reliable, and
neat.
Power cables, ground cables, and various signal cables are securely
connected. Adapters are securely plugged or screwed.
The N and PE cables are bound separately from the L1/L2/L3 or L cables
for each circuit breaker. Cables are converged at the beam and bound in
groups by cable ties.
5.4.2 Power Cable Specifications
YJV 5-core cables are recommended. When the ambient temperature is 40°C, the conductor
working temperature cannot exceed 90°C.
For the installation torque for power connection of involved electrical parts, see the
specifications of the electrical parts. If the torque is not specified, see the torque requirements
listed in the following table.
Table 5-7 Power cable specifications
Recommende
d
Cross-Section
al Area (mm
2
)
Terminal/Bolt
Specifications
Cord end
terminal
(crimping screw
specification: