PDU8000 Modular Precision PDC V2.0
User Manual
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 Commissioning Guide
6.1 Check Before Power-on Commissioning
Table 6-1 Hardware installation checklist
The cabinet is clean, without redundant screws, copper
wires, or other debris.
The paint on the cabinet exterior is intact.
The cabinet door and lock work properly.
All labels are correct, clear, and complete.
The surrounding area of the cabinet contains no waste tape,
cable ties, paper, or packing materials.
Table 6-2 Electrical connection checklist
All cables are connected properly.
The ground cable is connected properly.
The excessive sections of ground cables and power cables
are cut off.
Phase cables are connected properly.
All circuit breakers are OFF.