PowerCube 5000 (SUN2000-150KTL-S0)
Installation Guide
9 Power-on and Commissioning
Copyright © Huawei Technologies Co., Ltd.
Path
Parameters
Setting
NOTE
Configurable range: ±5% of the present voltage
level
Output Frequency (Hz)
Set based on site requirements.
NOTE
Configurable range: 50/60
Altitude (m)
Set based on site requirements.
NOTE
Configurable range: 01000, 10002000,
20003000 or 30004000
AC Phase Detect
Set based on site requirements.
NOTE
This parameter is displayed only when a
parallel system is used.
Configurable range: Start
If the power cabinet is not powered on for the
first time and the cable connection is
changed, choose Micrgrid System >
Monitoring > Running Control, and set AC
Phase Sequence Detect to Start on the
WebUI.
If the detection result is abnormal, alarms AC
Input Phase Sequence Incorrect and AC
Output Phase Sequence Incorrect will be
generated on the MDU and WebUI. In this
case, reconnect the cables.
6. Set the System Param. 4.
This parameter is displayed only when the number of DGs is set to 1.
Table 9-6 Setting the System Param. 4
Path
Parameters
Setting
Settings Wizard
DG Rated Power (kVA)
Set based on site
requirements.
DG Limited Power Point
(%)
Set based on site
requirements.
7. Set the Network Param.