EasyManua.ls Logo

Huawei SmartLi-ESM-24020P1 - Used with the UPS2000-H-6;10 KRTL-L (with a BBB Box); Installing Communications Cables

Huawei SmartLi-ESM-24020P1
71 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1.5.2 Used with the UPS2000-H-6/10KRTL-L (with a BBB Box)
NO TE
The method of installing cables for the UPS2000-H-6KRTL-L is similar to that for the
UPS2000-H-10KRTL-L. The gures in this section use the UPS2000-H-6KRTL-L as an
example. The number and colors of cables in the gures are for reference only.
1.5.2.1 Installing Communications Cables
Step 1 Install a communications cable between the battery module and the UPS.
Figure 1-34 Installing a communications cable between the battery module and
the UPS
(1) UPS
(2) Battery module
Step 2 If multiple battery modules are cascaded in a string, install parallel cables for the
battery modules.
Figure 1-35 Installing parallel cables between battery modules
SmartLi-ESM-24020P1
Quick Guide 1 Installation and Cable Connection
Issue 03 (2022-12-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 27

Related product manuals