Figure 1-55 Incorrect connection
----End
1.5.4.2 Installing Power Cables
Procedure
Step 1 Remove the covers from the UPS wiring ports.
Step 2 Remove the cover from the wiring port of each BBB box.
Step 3 Connect the PE cable to the UPS.
Figure 1-56 Connecting the PE cable to the UPS
Step 4 Connect the PE cable to the BBB box.
Figure 1-57 Connecting the PE cable to the BBB box
SmartLi-ESM-24020P1
Quick Guide 1 Installation and Cable Connection
Issue 03 (2022-12-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 42