Procedure
Step 1 Connect the signal cable to the signal cable connector block.
Connecting the inverter to the power meter
Figure 5-29 Installing the cable (connecting to the power meter)
Connecting the power meter and battery to the inverter
Figure 5-30 Installing cables (connecting to the power meter and battery)
SUN2000-(8K, 10K)-LC0 Series
User Manual 5 Electrical Connections
Issue 01 (2023-09-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 67