Procedure
Step 1 Connect the signal cable to the signal cable connector block.
● Connecting the inverter to the power meter
Figure 5-29 Installing the cable (connecting to the power meter)
● Connecting the power meter and battery to the inverter
Figure 5-30 Installing cables (connecting to the power meter and battery)