CA UTION
Do not route cables behind the air intake and exhaust vents of the equipment.
General Requirements
Follow the procedures described in the document for installation, operation,
and maintenance. Do not reconstruct or alter the equipment, add
components, or change the installation sequence without permission.
Obtain approval from the national or local electric utility company before
connecting the equipment to the grid.
Observe the power plant safety regulations, such as the operation and work
ticket mechanisms.
Install temporary fences or warning ropes and hang "No Entry" signs around
the operation area to keep unauthorized personnel away from the area.
Before installing or removing power cables, turn
o the switches of the
equipment and its upstream and downstream switches.
Before performing operations on the equipment, check that all tools meet the
requirements and record the tools. After the operations are complete, collect
all of the tools to prevent them from being left inside the equipment.
Before installing power cables, check that cable labels are correct and cable
terminals are insulated.
When installing the equipment, use a torque tool of a proper measurement
range to tighten the screws. When using a wrench to tighten the screws,
ensure that the wrench does not tilt and the torque error does not exceed
10% of the
specied value.
Ensure that bolts are tightened with a torque tool and marked in red and blue
after double-check. Installation personnel mark tightened bolts in blue.
Quality inspection personnel
conrm that the bolts are tightened and then
mark them in red. (The marks should cross the edges of the bolts.)
If the equipment has multiple inputs, disconnect all the inputs before
operating the equipment.
Before maintaining a downstream electrical device supply or power
distribution device, turn
o the output switch of its power supply equipment.
During equipment maintenance, attach "Do not switch on" labels near the
upstream and downstream switches or circuit breakers as well as warning
signs to prevent accidental connection. The equipment can be powered on
only after troubleshooting is complete.
Do not open equipment panels.
Check equipment connections periodically, ensuring that all screws are
securely tightened.
Only
qualied professionals can replace a damaged cable.
Do not scrawl, damage, or block any labels or nameplates on the equipment.
Promptly replace labels that have worn out.
SUN2000-(12KTL-25KTL)-M5 Series
User Manual 1 Safety Information
Issue 03 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 5

Table of Contents

Other manuals for Huawei SUN2000 M5 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei SUN2000 M5 Series and is the answer not in the manual?

Huawei SUN2000 M5 Series Specifications

General IconGeneral
Max Efficiency98.6%
Max Input Voltage1100 V
MPPT Operating Voltage Range200 V - 1000 V
Operating Temperature Range-25°C to +60°C
CommunicationRS485, 4G (optional)