7.1.3 Creating a PV Plant and a User
Figure 7-5 Creating a PV plant and a user
● In the quick settings, the grid code is set to N/A by default (automatic startup is not
supported). Set the grid code based on the area where the PV plant is located.
● For details about how to use the site deployment wizard, see
FusionSolar App Quick
Guide
. You can scan the QR code to download the quick guide.
7.1.4 (Optional) Setting the Physical Layout of the Smart PV
Optimizers
For details about the optimizer physical layout, see
FusionSolar App Quick Guide
or online help of the management system.
7.1.5 Detecting Optimizer Disconnection
Log in to the FusionSolar app, choose Device Commissioning > Maintenance >
Optimizer disconnection detection, tap the detection button to detect the
optimizer disconnection, and rectify the fault based on the detection result.
SUN2000-(12KTL-25KTL)-M5 Series
User Manual 7 Man-Machine Interactions
Issue 03 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 55