Hoisting
Only trained and qualied personnel are allowed to perform hoisting
operations.
Install temporary warning signs or fences to isolate the hoisting area.
Ensure that the foundation where hoisting is performed on meets the load-
bearing requirements.
Before hoisting objects, ensure that hoisting tools are
rmly secured onto a
xed object or wall that meets the load-bearing requirements.
During hoisting, do not stand or walk under the crane or the hoisted objects.
Do not drag steel ropes and hoisting tools or bump the hoisted objects
against hard objects during hoisting.
Ensure that the angle between two hoisting ropes is no more than 90
degrees, as shown in the following gure.
Drilling Holes
Obtain consent from the customer and contractor before drilling holes.
Wear protective equipment such as safety goggles and protective gloves when
drilling holes.
SUN2000-(12KTL-25KTL)-M5 Series
User Manual 1 Safety Information
Issue 03 (2023-02-15) Copyright © Huawei Digital Power Technologies Co., Ltd. 11

Table of Contents

Other manuals for Huawei SUN2000 M5 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei SUN2000 M5 Series and is the answer not in the manual?

Huawei SUN2000 M5 Series Specifications

General IconGeneral
Max Efficiency98.6%
Max Input Voltage1100 V
MPPT Operating Voltage Range200 V - 1000 V
Operating Temperature Range-25°C to +60°C
CommunicationRS485, 4G (optional)