3 Installation
3.1 Installation Preparations
Floor Loading Capacity
The
oor should be able to bear the weight of the UPS and its optional
components. In the case of rack-mounted installation, ensure that the oor can
also bear the weight of the rack.
Installation Environment
Do not install the UPS in a high-temperature, low-temperature, or damp place
that is beyond the technical
specications.
Keep the UPS far away from water, heat sources, and ammable and
explosive substances. Install the UPS in an environment free of dust, volatile
gas, salt, and corrosive materials. Avoid direct sunlight.
Do not install the UPS in environments with conductive metal scraps in the
air.
The optimal operating temperatures for batteries are 20–30°C. Operating
temperatures higher than 30°C shorten the battery lifespan, and operating
temperatures lower than 20°C reduce the battery backup time.
Installation Clearances
Reserve a clearance of at least 500 mm from the front and rear of the chassis.
UPS2000-G-6KRTLL
User Manual 3 Installation
Issue 02 (2022-06-30) Copyright © Huawei Technologies Co., Ltd. 21